Conservefor
  • Peatland
    Restoration
  • Landscape
    Engineering
  • Countryside
    Conservation
  • Access &
    Recreation
  • Bike
    Trails
    • MTB Bike Trail Design and Build
    • Pump Track Design and Construction
  • Coir
    Products
    • Coconut Coir Logs
    • Coconut Coir Geo-Textiles
  • Case
    Studies
  • Search
  • Menu
You are here: Home / Coconut Coir Geo-Textiles / School Pump Track Construction – Morpeth Road Primary
01729 824750

School Pump Track Construction – Morpeth Road Primary

 

 

School Pump Track Construction
School Pump Track Construction School Pump Track Construction School Pump Track Construction School Pump Track Construction School Pump Track Construction

Specialist school pump track construction contractor Conservefor were appointed to work to a design, created by expert pump track designers Architrail, for a bespoke pump track specifically for use by primary school aged pupils.

The 120m design included a start hill, separate entry and exit ramps, jumps, rollers and tarmac berms all designed for use by younger riders to enable the pupils to improve their riding skills for use on the school’s regular riding trips around Europe and also allow the school to host interschool pump track events and competitions.

As the pump track was to be constructed on a school field during opening hours Conservefor implemented extensive safety procedures to ensure the safety of pupils at all times and minimizing the disruption to the day to day running of the school.

All of Conservefor’s experienced trail builders are DBS checked to ensure their suitability to work in schools. Before works commenced rigorous risk assessments were carried out and school field was secured with high fencing, to be inspected daily. All deliveries, storage of materials and access were to be managed from a compound outside the school boundary, away from any exits or routes used by parents and pupils. Access and egress routes from the compound and work area were clearly marked and adhered to ensure limited damage by plant to the school field. Regular meetings were also held with the teachers and staff to keep them informed of planned work and address any enquiries.

Conservefor and Architrail have a long and close working relationship and have a wealth of experience in school pump track construction. our teams are able to convert designs from concept to finished product promptly, professionally and to a high standard with minimal disruption outside the working area.

Our Expertise

  • Peatland Restoration
  • Civil Engineering
  • Countryside Conservation
  • Access & Recreation
  • MTB Trail Design & Construction
  • Pump Track Design & Construction
  • Supply and Installation of Coir Logs
  • Supply and Installation of Coir Geo-Textiles

Our Company

  • About Us
  • Contact Us
  • Accreditations

  • Limited Company number: 7925958
  • VAT: Registration Number: 126 2526 33
ISO 14001 Certified - Conservefor UVDB Registered - Conservefor

Our Health and Safety Policy and Environment Policy are available on request.

Tweets by conservefor
© Copyright - Conservefor
Upland Footpath Construction – Winston Lee Tor, Derbyshire Winstone Lee Tor – Upland Footpath Construction MTB Skills Trail Construction MTB Skills Trail Construction – Templeton Woods, Dundee
Scroll to top